RateCDRs (TWR1)

Description

This task (re)calculates the price of the CDRs that are already copied on the SMP.

Release notes

Version 1.3.0 - Early deployment
  • Improvement: We don't fetch values from the SOP anymore. The task can be run without the SOP to be connected (M6730)
  • Dependency:
    • SMP Admin v1.9.0+

Version 1.2.0 - General deployment
  • Bugfix: When the timeslot was changed, it was not recalculated on cdr's that were already synced (M6846)
  • Dependency:
    • SMP Admin v1.9.0+

Version 1.1 - Early deployment
  • Bugfix: Call date field corrupted for updated records (M4795)
  • Dependency:
    • SMP Admin v1.9.0+

Version 1.0 - Deprecated
  • Deprecated: running the task sets calldate to the current date for updated rows (M00004795)
  • Feature: allows to specify time range

Version 0.1 - Deprecated
  • Deprecated: Significant improvements have been done in a higher version

Version 0.0 - Deprecated
  • Deprecated: Not used anymore
  • Feature: Initial release

Resource configuration interface

GUI unavailable.

Task configuration parameters provided by SMP 5.3+

Warning: Can't find topic CustomerDocs.GenSmpDocCommonTaskParametersRGb55

Calculate the price of CDRs that are already on the SMP (copied by SyncCDRDB). The price of a CDR is calculated by matching the time with the Timeslot Definition and matching the destination with the Price List. It should be clear that an accurate calculation is only possible if these are properly set up. The unit is unspecified, it is whatever unit is used in the Price List, e.g. eurocent.

Resource configuration parameters

  • Recalculate: Whether to recalculate the price of all CDRs or just the once that haven't been calculated before.
  • Time Range: Only rate CDRs within the specified time range. Start or End may be left blank which means there is no upper or lower limit on the date.
Copyright © Escaux SA