Fusion 3.0 Staging guide

Introduction

The UC Template is a modular solution for IP-telephony and Unified Communications. The solution is based on open standards and is very efficient from an operational point of view. The UC Template is software delivered as a service (SaaS). Updates and a water-proof disaster recovery pack (automated and guaranteed back-up, documentation, redundancy) are included. The solution is most scalable and allows you to effectively respond to the changing communication needs of your organisation. The UC Template is a rich IP-PABX solution, designed to maximize the self-management by IT administrators and end-users. This guide will help you to go through the configuration of your UC Template solution.

Intended audience

This guide is intended for certified engineers only.

Disclaimer

This document is confidential. It is provided for informational purposes only and is not guaranteed to be without errors. Some of the functionalities described may be specific to a device, to an application or to a network. Some features may only be available as optional functionality. Escaux has a policy of continuous improvement and therefore reserves the right to modify this document without prior notice.

Goal of this document

The goal of this document is to describe all actions that need to be done to do the initial staging of a UC Template solution

Needed software

To install a SOP with the UC template version 3.0, versions 2.2 until 2.3.0 of the baseline should be used. To install a SOP with the UC template version 3.1, versions 2.4 of the baseline should be used. The procedure to make a bootable USB flash drive can be found here.

Interface cards

Thanks to the new Sangoma card driver (netBorder), cards can be inserted in any order.

ALERT! Don't forget to connect the Molex cable for FXS (and BRI-FXS) cards.

ALERT! If a PRI or BRI-FXS card is used in combination with a 4FXS card, connect a clock sync cable between the 2 cards with the red cable on the opposite side of the slot (otherwise the driver won't start)

See Cards Hardware Installation for generic instructions on how to install cards.

Staging checklist

Make sure to execute the ListPackages task to make sure all modules have been installed correctly (Attention: you need to click "view report" after running the task to see errors)
In case of an error
  1. Inform support so it can be fixed in the future
  2. Reinstall the module and check again
  3. If still not ok: ask support to fix the problem
Copyright © Escaux SA